A PROJECT TO SUPPLY SOME CITIES AND VILLAGES WITH DRINKING WATER FROM UNDERGROUNDWELLS
⦁ Owner: Ministry of Electricity, Water and Gas
⦁ Completion rate: 100%
⦁ Contract date: 2007
The project includes carrying out the necessary engineering works to develop and improve the main water transmission lines from the sources of supply (ground wells) for some cities and villages located on the coast, Where the development and improvement works for the main transport lines of the city of AL-KHUMS, TARHOUNA and the surrounding villages have been completed, and the estimated lengths of the lines are about 75 linear kilometers and their diameters range from 200 mm to 600 mm, the work also includes the development of underground and overhead tanks and pumping stations necessary to raise water in the system.